d1_banner1.jpg phd1_banph.jpg

Intelligent Networking

PPK fully automatic assembly testing line

Date:2025/1/2 22:07:16 Hits:21
PPK fully automatic assembly testing line
  • Process flow: Manual loading station ->Tunnel heating furnace ->Docking station->High temperature testing station ->Cooling station ->Normal temperature testingstation ->Manual unloading station. By connecting all testing stations in seriesthrough the up and down circulating conveyor lines, for product heating (≤ 80 ℃), theconveyor tray directly enters the double speed chain heating tunnel furnace
  • Product traceability: The device is equipped with a barcode scanner to identify the QRcode on the components or products.
  • Provide production line level MES to achieve data exchange, traceability, reporting, and production process management (including defective product management) of theproduction line.